Satpur MIDC, Nashik

Stock you can check before you telephone

Coil and sheet held on site, cut to your list rather than to a standard length. The mill test certificate travels with the material and the turnaround is quoted before the order is taken.

Stock list updated daily
Mill TC with every despatch

What the centre holds

Four figures about this site. Nothing here is a property of the steel — that belongs to the mill certificate.

1,600 mm
Widest coil the slitting line takes
0.8–8 mm
Thickness range held in stock
2,200 t
Coil and sheet on the floor at any time
48 hr
Standard turnaround, quoted before the order

The lines

Four processes on one floor, so material is not trucked between them.

Coil to strip

Up to 1,600 mm wide and 8 mm thick, down to 25 mm strip. Edge camber is measured on the first and last coil of every run and both readings are on the despatch note.

Coil to strip

What we hold, and at what

A tolerance without the thickness and width it was measured across is a number that changes with the job. These do not.

Width, on the slitter

±0.15 mm on strip up to 3 mm thick, ±0.25 mm above it. Measured at three points across every coil, first and last, and both readings printed.

Length, cut to length

±1 mm up to 3,000 mm and ±2 mm beyond it. A shorter tolerance is available and is priced separately rather than quietly assumed.

Flatness, after levelling

Under 3 mm per metre on material 2 mm and thicker. Below 2 mm we will tell you what the line actually achieves on your grade rather than quote a figure that suits the page.

How an order runs

Four steps, and you have the turnaround before step two.

1

Send the list

Grade, thickness, widths and lengths with quantities. A drawing is welcome and is not required — a list is enough for a rate.

2

Rate and date, together

Quoted per tonne with the processing shown separately, and with the despatch date on the same email. A rate without a date is half a quotation.

3

Cut against your list

Coil numbers recorded per item. If a length has to come off a second coil you are told, because two coils is two certificates.

4

Despatch

Note carries the coil number, the measured widths and the mill test certificate. Anything queried later is settled from paper rather than from recollection.

Send a list, get a rate and a date

Most lists are quoted the same working day. If yours needs material we do not hold, that is what the reply will say rather than a longer date.